Extended Thermal Endurance
Engineering & Technology · EmpowerEd Edge
This report combines the historical thermal observation of 26 September 2026 with the thermal checkpoints recorded during the 27 November 2026 prototype investigation. The prototype operated for approximately 12 hours in September and for 6 hours 13 minutes to the designated November endpoint. Three November checkpoints recorded 48.8°C at 2h 45m, and 50.5°C at both 3h 29m and 6h 13m, with firmware throttling status 0x0 at each checkpoint. The original September diagnostic records were not recovered, so no historical throttling behaviour is claimed.
47.2°C
September observation
48.8°C
2h 45m